International NO DIG 2019 – Microtunneling/Pipe Jacking/Auger Boring


September 30th 2019
Chairman: Mark André Haebler – International Sales and Development OGL

E-Power Pipe®: jet pump technology for longdistance drives in small diameters
Relator: Marc Peters (Herrenknecht AG – Germany)

Download Paper Download Presentation


TUnIS Navigation E-Power Pipe – Precise guidance of small diameter tunnelling machines
Relator: Jürgen Göckel (VMT GmbH – Germany)

Download Paper Download Presentation


Stability of surrounding soil by using under pinning pipe jacking method
Relator: Hideki Shimada (Kyushu University, Department of Earth Resources Engineering – Japan)

Download Paper Download Presentation


A microtunnel with a very little radius for a big pipeline
Relator: Vittorio Petrucco (I.C.O.P. S.p.A. – Italy)

Download Paper Download Presentation


October 2nd 2019
Chairman: Claudio Mastronardi – Member of IATT Technical Microtunnelling Commission

The choice of the best technology for laying an underground pipe. A successful case: crossing the Adda river by the direct pipe method
Relator: Mara Tonelli (I.C.O.P. spa – Italy)

Download Paper Download Presentation


Short-Segment Jacking of Water Main for Realignment under Limited Space in Urban Area
Relator: Wu Shihchi (Taipei Water Departmen – Taiwan)

Download Paper Download Presentation


Microtunneling projects for power-transmission pipes- steep slopes and casing technology
Relator: Masahiro Yoshimoto (TEPCO Power Grid Inc. – Japan)

Download Paper Download Presentation


Tight curved microtunnel in Auckland; New Zealand
Relator: Estelle Clayes (Bessac, France)

Download Paper


Technology transfer – how dredging and shipbuilding innovations are improving (micro) tunnelling operations
Relator: Tobias Vraetz (Royal IHC, The Netherlands)

Download Paper Download Presentation